CTA RPM Phase 1

The T.Y.Lin International, Dynasty Group, and American Surveying & Engineering team was selected as the Surveyor of Record for the CTA Red Purple Modernization (RPM) Project. The Phase 1 scope includes the improvement at RPM Bypass (Belmont Flyover) and Leland to Hollywood.
  • Topographic
  • Utilities
  • Plats of Survey
  • Survey Controls
  • Video Red
  • Video Brown
  • Track LiDAR
  • Street LiDAR
  • Track Topo
  • Street Topo
  • Plans
  • Below Rim
  • OUC Research
  • Existing ROW
  • Parcels for Land Acq.
  • Research Doc
  • Map
  • Report
  • NB Front
  • NB Front Left
  • NB Rear
  • NB Rear Right
  • SB Front
  • SB Front Left
  • SB Rear
  • SB Rear Right
  • NB Front
  • NB Rear
  • SB Front
  • SB Rear
Managed by Dynasty Group
Powered by uGRIDD.com