CTA RPM Phase 1
The T.Y.Lin International, Dynasty Group, and American Surveying & Engineering team was selected as the Surveyor of Record for the CTA Red Purple Modernization (RPM) Project. The Phase 1 scope includes the improvement at RPM Bypass (Belmont Flyover) and Leland to Hollywood.
- Topographic
- Utilities
- Plats of Survey
- Survey Controls
- Video Red
- Video Brown
- Track LiDAR
- Street LiDAR
- Track Topo
- Street Topo
- Plans
- Below Rim
- OUC Research
- Existing ROW
- Parcels for Land Acq.
- Research Doc
- NB Front
- NB Front Left
- NB Rear
- NB Rear Right
- SB Front
- SB Front Left
- SB Rear
- SB Rear Right
- NB Front
- NB Rear
- SB Front
- SB Rear
Intersecting Roadways
Stationing
Passenger Station
The FlyTo panel is under construction.
H1 Tittle heading font
Paragraph information Paragraph information Paragraph information Paragraph information Paragraph information Paragraph information Paragraph information Paragraph information Paragraph information Paragraph information Paragraph information Paragraph information Paragraph information。。。。。